Home DDS (GRONDOPSTELLING)
DDS (GRONDOPSTELLING)
MUNICIPALITY: Dendermonde
TECHNICAL DATA: 1440 kWp
Company:
Prevention, collection, processing and recycling of waste for the Dender-Durme-Schelde region.
Installation:
Ground installation on a waste dump covered with sheeting
Area used: 25,000 m²
320 tables of 20 panels = 6,400 panels 225 Wp = 1.44 MWp
Electricity production equivalent to the annual consumption of 370 families 590 tons of CO² reduction per year
DDS-Verko chose the financing plan from Solar Technics in which they receive rent for the lease of the ground and that enables their waste processing installations to run largely on cheap green energy. The fact that Solar Technics is part of a large, financially strong group was also a decisive argument for entering into this 20 year contract.